Today was handover day. Everything went well and the team at Wisdom have been brilliant. We are very thankful for the quality of work and professionalism from them. Now for the move. Ahhh!!!!
- Posted using BlogPress from my iPad
Showing posts with label squeakbuild. Show all posts
Showing posts with label squeakbuild. Show all posts
Wednesday, August 10, 2011
Thursday, August 4, 2011
External Photos
Nothing much has happened build over the last week wise except for the finishing touches to the cosmetic things we found during the PCI, so I thought I would upload some external photos after the site fence has been removed.
Labels:
bricks,
build,
colours,
fence,
home,
land,
roof,
sienna gardens,
squeakbuild,
Wisdom
Weekly Photo - Week 21
Weekly Progress photo 31/07/2011
Changes: PCI Done, Home Theater cabling, Handover booked, whirly bird installed, site fence removed
First time of parking the car on the driveway.
Changes: PCI Done, Home Theater cabling, Handover booked, whirly bird installed, site fence removed
First time of parking the car on the driveway.
Thursday, July 28, 2011
Photos and tentative handover
Seeing that we got to go inside today I took the chance to grab a few pics.
Our handover has been booked for August 10th and our SS has confidence that this will happen, as long as all other parties play along.
Here are the pics:
Our handover has been booked for August 10th and our SS has confidence that this will happen, as long as all other parties play along.
Here are the pics:
Kitchen Splash back
Wet areas
Linen/Media Cupboard
Leisure Room Media alcove
Home theater cabling
Garage door motor
Labels:
bathroom,
build,
door,
electrical,
garage,
handover,
home theater,
inspection,
internal linings,
kitchen,
laundry,
living areas,
PCI,
progress,
providence,
settlement,
squeakbuild,
toilet,
Wisdom
PCI Done!
We had our PCI today and boy didn't we go through the house with a fine tooth comb. We rattled things, opened and closed things and turned things on and off. We were expecting to find a few things but everything we found was mostly cosmetic. I think my site supervisor got sick of me saying " I don't remember the house being this big" lol.
Labels:
home,
house,
inspection,
lock up,
paint,
PCI,
progress,
squeakbuild,
squeakbuilds,
Wisdom
Sunday, July 24, 2011
Weekly Photo - Week 20
Weekly Progress Photo 24/07/2011
Changes: Internal living area tiles, carpet, driveway, tiling complete, some cleaning, home theater cabling done, PCI arranged.
Changes: Internal living area tiles, carpet, driveway, tiling complete, some cleaning, home theater cabling done, PCI arranged.
Carpet and Practical Completion inspection.
Dropped by today to find that our carpet has been laid in all rooms and some cleaning has been done.
We also received a call from our Site supervisor to book in our PCI for 28/7 at 0900hrs.
Things have really moved along and it seems like a good time for us to start packing.
We also received a call from our Site supervisor to book in our PCI for 28/7 at 0900hrs.
Things have really moved along and it seems like a good time for us to start packing.
Labels:
bedroom,
build,
carpet,
colours,
floor,
home,
house,
inspection,
internal linings,
squeakbuild
Friday, July 15, 2011
One Big update!!
Due to a few things happening at the moment, here is one big update to cover quite a few things that have happened over the last week or so.
Water Tank and down pipes installed
Electrical and Kitchen Splash Back done.
Water Tank and down pipes installed
Door Furniture installed.
Wet Area fittings installed
Monday, July 4, 2011
Tiling underway
Whilst the Painters finish the other areas of the house, the tiler has been in and laid some tiles! I am very happy with the tiles we have chosen. Our Laundry tub was also installed. We were unable to get photos of the en suite as the tiler was still hard at it.
Labels:
bathroom,
build,
colours,
Di Lorenzo,
home,
house,
internal linings,
laundry,
paint,
squeakbuild,
squeakbuilds,
tiles,
vanity,
walls
Subscribe to:
Posts (Atom)