Today was handover day. Everything went well and the team at Wisdom have been brilliant. We are very thankful for the quality of work and professionalism from them. Now for the move. Ahhh!!!!
- Posted using BlogPress from my iPad
Showing posts with label progress. Show all posts
Showing posts with label progress. Show all posts
Wednesday, August 10, 2011
Tuesday, August 9, 2011
Almost time!!!
After speaking to the builder yesterday it appears everything is go for tomorrow.
This means tomorrow morning I shall get the keys, garage door controls and unrestricted access to the house. WOO HOO!!!!
Thanks to all who have followed our journey this far. :-)
- Posted using BlogPress from my iPad
This means tomorrow morning I shall get the keys, garage door controls and unrestricted access to the house. WOO HOO!!!!
Thanks to all who have followed our journey this far. :-)
- Posted using BlogPress from my iPad
Thursday, August 4, 2011
Weekly Photo - Week 21
Weekly Progress photo 31/07/2011
Changes: PCI Done, Home Theater cabling, Handover booked, whirly bird installed, site fence removed
First time of parking the car on the driveway.
Changes: PCI Done, Home Theater cabling, Handover booked, whirly bird installed, site fence removed
First time of parking the car on the driveway.
Thursday, July 28, 2011
Photos and tentative handover
Seeing that we got to go inside today I took the chance to grab a few pics.
Our handover has been booked for August 10th and our SS has confidence that this will happen, as long as all other parties play along.
Here are the pics:
Our handover has been booked for August 10th and our SS has confidence that this will happen, as long as all other parties play along.
Here are the pics:
Kitchen Splash back
Wet areas
Linen/Media Cupboard
Leisure Room Media alcove
Home theater cabling
Garage door motor
Labels:
bathroom,
build,
door,
electrical,
garage,
handover,
home theater,
inspection,
internal linings,
kitchen,
laundry,
living areas,
PCI,
progress,
providence,
settlement,
squeakbuild,
toilet,
Wisdom
PCI Done!
We had our PCI today and boy didn't we go through the house with a fine tooth comb. We rattled things, opened and closed things and turned things on and off. We were expecting to find a few things but everything we found was mostly cosmetic. I think my site supervisor got sick of me saying " I don't remember the house being this big" lol.
Labels:
home,
house,
inspection,
lock up,
paint,
PCI,
progress,
squeakbuild,
squeakbuilds,
Wisdom
Sunday, July 24, 2011
Weekly Photo - Week 20
Weekly Progress Photo 24/07/2011
Changes: Internal living area tiles, carpet, driveway, tiling complete, some cleaning, home theater cabling done, PCI arranged.
Changes: Internal living area tiles, carpet, driveway, tiling complete, some cleaning, home theater cabling done, PCI arranged.
Weekly Photo - Week 19
Weekly Progress Photo 17/07/2011
Changes: Tiling almost complete, home theater Cabling started, electrical completed, more fittings installed, door furniture installed, kitchen splashback done, down pipes installed
Changes: Tiling almost complete, home theater Cabling started, electrical completed, more fittings installed, door furniture installed, kitchen splashback done, down pipes installed
Labels:
build,
home,
house,
internal linings,
kitchen,
laundry,
lock up,
progress,
squeakbuilds,
tiles,
walls,
Wisdom
Friday, July 15, 2011
One Big update!!
Due to a few things happening at the moment, here is one big update to cover quite a few things that have happened over the last week or so.
Water Tank and down pipes installed
Electrical and Kitchen Splash Back done.
Water Tank and down pipes installed
Door Furniture installed.
Wet Area fittings installed
Weekly Photo - Week 18
Week 18 Progress Photo 10/07/2011
Changes: Painting Complete, More Tiling, More electrical, water tank installed
Changes: Painting Complete, More Tiling, More electrical, water tank installed
Monday, July 4, 2011
Weekly Photo - Week 17
Week 17 Progress Photo 03/07/2011
Changes: Painting Continues, Tiling started, More minor electrical work, Laundry tub installed.
Changes: Painting Continues, Tiling started, More minor electrical work, Laundry tub installed.
Labels:
bathroom,
build,
Di Lorenzo,
home,
house,
internal linings,
laundry,
porch,
progress,
roof tiles,
tiles,
toilet
Sunday, June 26, 2011
Weekly Photo - Week 16
Week 16 Progress Photo 26/6/2011
Changes: Waterproofing, Painting Commenced, Minor Electrical work, carpentry finished, Tiles Changed, Kitchen sink and benchtop installed.
A beautiful foggy winter morning. :)
Changes: Waterproofing, Painting Commenced, Minor Electrical work, carpentry finished, Tiles Changed, Kitchen sink and benchtop installed.
A beautiful foggy winter morning. :)
Labels:
build,
house,
internal linings,
kitchen,
paint,
progress,
squeakbuilds,
tiles,
Wisdom
Monday, June 20, 2011
Weekly Photo - Week 15
Week 15 Progress photo 19/06/2011
Changes - More electrical, Garage door installed, gas meter installed, more skirting done.
Changes - More electrical, Garage door installed, gas meter installed, more skirting done.
Monday, June 13, 2011
Locked up!
We have reached lock up stage! It makes it hard to get pics but it means we are getting ever so close to the end. They have done some of the skirting boards, internal doors and waterproofing.
I hope to get some better pics tomorrow, but here are some taken from outside through the windows.
I hope to get some better pics tomorrow, but here are some taken from outside through the windows.
Subscribe to:
Posts (Atom)