Today was handover day. Everything went well and the team at Wisdom have been brilliant. We are very thankful for the quality of work and professionalism from them. Now for the move. Ahhh!!!!
Nothing much has happened build over the last week wise except for the finishing touches to the cosmetic things we found during the PCI, so I thought I would upload some external photos after the site fence has been removed.
We had our PCI today and boy didn't we go through the house with a fine tooth comb. We rattled things, opened and closed things and turned things on and off. We were expecting to find a few things but everything we found was mostly cosmetic. I think my site supervisor got sick of me saying " I don't remember the house being this big" lol.
Changes: Tiling almost complete, home theater Cabling started, electrical completed, more fittings installed, door furniture installed, kitchen splashback done, down pipes installed
They have installed our garage door and gas meter. This must mean they successfully found the gas line, as the last we heard was they couldn't find it. I haven't been able to get in to the house to take some more photos of the kitchen and vanities just yet as nobody has been on site when I have visited. But I shall keep trying.
The Architraves have been done throughout the house and we love the decorative one in the main areas of the house. We have also been advised that we should reach lock up stage this week. :)
The internal linings have commenced. The Gyprock has been placed on the walls and ceilings making the rooms look big again and reminding us of all the wonderful spacious reasons we chose the Providence by Wisdom.