Weekly Progress Photo 24/07/2011
Changes: Internal living area tiles, carpet, driveway, tiling complete, some cleaning, home theater cabling done, PCI arranged.
Showing posts with label carpet. Show all posts
Showing posts with label carpet. Show all posts
Sunday, July 24, 2011
Carpet and Practical Completion inspection.
Dropped by today to find that our carpet has been laid in all rooms and some cleaning has been done.
We also received a call from our Site supervisor to book in our PCI for 28/7 at 0900hrs.
Things have really moved along and it seems like a good time for us to start packing.
We also received a call from our Site supervisor to book in our PCI for 28/7 at 0900hrs.
Things have really moved along and it seems like a good time for us to start packing.
Labels:
bedroom,
build,
carpet,
colours,
floor,
home,
house,
inspection,
internal linings,
squeakbuild
Internal Floor Tiles
Internal floor main living area tiles have been laid. shouldn't be long before carpet, cleaning and MOVING IN!!! Can't wait!
Sunday, April 10, 2011
Tiles and Carpet Selection
Saturday seen us head over to Di Lorenzo to make our carpet and tile selection. This is what we chose:
Carpet: Victoria Carpet
Colour: Savino forte 50% wool/50% Nylon Blend
Main Living Tiles: Cocoa Smooth
Front Porch/Step Tiles - Cocoa
Wet Area Floor Tiles: 2Brech/Smooth Grey
Wet Area Wall Tiles: Polatino White Gloss
Carpet: Victoria Carpet
Colour: Savino forte 50% wool/50% Nylon Blend
Main Living Tiles: Cocoa Smooth
Front Porch/Step Tiles - Cocoa
Wet Area Floor Tiles: 2Brech/Smooth Grey
Wet Area Wall Tiles: Polatino White Gloss
Feature Tile strip - Mosaic #109
Subscribe to:
Posts (Atom)