Pages

Showing posts with label waterproofing. Show all posts
Showing posts with label waterproofing. Show all posts

Sunday, June 26, 2011

Waterproofing and minor things

Here are some better pics of the waterproofing in the Bathroom and ensuite. I have also included pics of the garage door and electrical work that was done to pull the cables through for the GPO's and switches. One of the bottom pics is the robe that we added to bed 4/Office. In the original house plan it was a sort of bookcase area.


Waterproofing


 Garage Door


Electrical Holes


Single robe/Office cupboard and waterproofing

Monday, June 13, 2011

Kitchen & Vanity

Our Kitchen cabinets and Vanities in the En-suite and bathroom has been installed.
Again I hope someone is working at the site tomorrow to get in to get some photos.





Locked up!

We have reached lock up stage! It makes it hard to get pics but it means we are getting ever so close to the end. They have done some of the skirting boards, internal doors and waterproofing.

I hope to get some better pics tomorrow, but here are some taken from outside through the windows.