Week 8 Progress Photo 01/05/2011
Changes: Windows Installed, Plumbing installed, Bricks, Sand and cement delivered.
Showing posts with label slab. Show all posts
Showing posts with label slab. Show all posts
Sunday, May 1, 2011
Weekly Photo - Week 8
Labels:
bricks,
build,
cement,
dirt,
frame,
plumbing,
progress,
sand,
slab,
squeakbuild,
timber,
windows
Friday, April 15, 2011
Little annoying things
Now I'm sure a few more of these little annoying things will pop up throughout the build, but I wasn't expecting them to start so early on in the piece.
I visited our site today to find someone has started to use our site as a dumping ground for builders waste. This tiling waste has shown up in the last 24 hours dumped in our driveway.

I also noticed that when the external plumbing was done they have damaged our slab in the alfresco area. They attempted to repair it but done a pretty crappy job.

We weren't planning on tiling this for a little while so I hope they fix it properly. I have passed it on to Wisdom, let's hope they can fix it, as it really stands out makes the area look bad.
- Posted using BlogPress from my iPad
I visited our site today to find someone has started to use our site as a dumping ground for builders waste. This tiling waste has shown up in the last 24 hours dumped in our driveway.
I also noticed that when the external plumbing was done they have damaged our slab in the alfresco area. They attempted to repair it but done a pretty crappy job.
We weren't planning on tiling this for a little while so I hope they fix it properly. I have passed it on to Wisdom, let's hope they can fix it, as it really stands out makes the area look bad.
- Posted using BlogPress from my iPad
Monday, April 11, 2011
Slabbed!
Our slab has been poured and doesn't it look good. Next step Frame and Windows!!
Home Theater & Garage
Water tank Slab & Kitchen
Lesuire Room & Alfresco
Bedroom 4 & Laundry
Toilet & Bathroom
Bedroom 2, Study/Bedroom 4 and Ensuite
Master Bedroom & Front Porch
The Slab & Side of the Slab
Sunday, April 10, 2011
Thursday, April 7, 2011
Pre Slab
All of the Waffle Pods and Rio Mesh have been put in place ready for the slab to be poured. Maybe we will have a slab by Friday





SS, Waffle Pods, Mesh and Plumbing
Wednesdays visit seen more progress on the slab work. We had delivery of the Waffle Pods and Rio Mesh and work has been done on the plumbing.
We have also had what I believe to be an earth cable show up.
We also received a phone call from our SS (J) introducing himself and advising of the progress and that he will be ordering the frame shortly. He said we should have a slab by the end of the week but I reckon early next week as the weather hasn't exactly been on our side.




We have also had what I believe to be an earth cable show up.
We also received a phone call from our SS (J) introducing himself and advising of the progress and that he will be ordering the frame shortly. He said we should have a slab by the end of the week but I reckon early next week as the weather hasn't exactly been on our side.
Labels:
build,
dirt,
electrical,
excavation,
peiring,
plumbing,
progress,
site,
slab,
Wisdom
Slab Formwork and Piering
Its come to the stage of daily visits to the site and so far something different has happened every day. We know it wont be this way all the time but its good to see.
On Tuesday I dropped by and we had our peiring and slab layout/formwork.







On Tuesday I dropped by and we had our peiring and slab layout/formwork.