Whilst I was visiting the site today the bricks showed up. The driver from Austral was very friendly to chat with. thankfully the rain held of just long enough for them to be unloaded.
Thursday, April 28, 2011
Windows Installed and Internal Plumbing
Our Windows were installed on Wednesday. Along with the internal plumbing being done. All the windows were there except for the Kitchen, which should show up soon.
Internal Plumbing
En-suite & Bedroom 2/Office
Bedroom 3 & Bathroom
Laundry & Bedroom 4
Alfresco Sliding Door & Leisure
Kitchen & Home Theater
Master Suite
Internal Plumbing
External Gas Point & Front tap
Hot Water Point & Back Tap
En-suite Shower & Stove Gas Point
Kitchen Sink, Dishwasher & Internal Gas Point
Bath & Shower
Laundry
Labels:
build,
gas,
plumbing,
squeakbuild,
Sydney Water,
windows
Sunday, April 24, 2011
Windows Delivered
Our windows arrived on Thursday. All but one. Its kinda strange but all the windows except for the kitchen window was delivered. It is a different type of window (it is fixed, all others open) so maybe it comes from a different supplier or takes a little longer to make.
Friday, April 22, 2011
Meeting the neighbours.
This morning as we were checking out the frame work out we were able to catch a quick glimpse of our new neighbours. They shouldn't give us any trouble we don't think. :-)
- Posted using BlogPress from my iPad
- Posted using BlogPress from my iPad
Labels:
build,
cows,
frame,
neighbours,
sienna gardens
Wednesday, April 20, 2011
We've been framed.
Our frame has gone up today. I didn't expect it to happen so quickly! So far the weather is holding off for us, lets hope it continues.
Bathroom & Bedroom 3
Hallway and Dining room
Entrance Hall & Garage
Home Theater & Kitchen
Alfresco and Master Suite
En-suite and WIR
Bedroom 4 & Bedroom 4 Robe
Toilet and Laundry
External Front & Back
Leisure Room
Labels:
alfresco,
bathroom,
build,
frame,
garage,
home,
house,
kitchen,
progress,
providence,
site,
squeakbuild,
timber,
toilet,
Wisdom