Thursday, April 28, 2011

Bricks Delivered

Whilst I was visiting the site today the bricks showed up. The driver from Austral was very friendly to chat with. thankfully the rain held of just long enough for them to be unloaded.





Windows Installed and Internal Plumbing

Our Windows were installed on Wednesday. Along with the internal plumbing being done. All the windows were there except for the Kitchen, which should show up soon.

 En-suite & Bedroom 2/Office 

 Bedroom 3 & Bathroom

 Laundry & Bedroom 4

 Alfresco Sliding Door & Leisure

 Kitchen & Home Theater 

 Master Suite

Internal Plumbing
External Gas Point & Front tap 

 Hot Water Point & Back Tap

 En-suite Shower & Stove Gas Point

 Kitchen Sink, Dishwasher & Internal Gas Point

 Bath & Shower

Laundry

Sunday, April 24, 2011

Weekly Photo - Week 7

Week 7 Progress Photo 24/04/2011
Changes: Frame Delivered, Frame erected, Windows Delivered



Windows Delivered

Our windows arrived on Thursday. All but one. Its kinda strange but all the windows except for the kitchen window was delivered. It is a different type of window (it is fixed, all others open) so maybe it comes from a different supplier or takes a little longer to make.




Friday, April 22, 2011

Meeting the neighbours.

This morning as we were checking out the frame work out we were able to catch a quick glimpse of our new neighbours. They shouldn't give us any trouble we don't think. :-)






- Posted using BlogPress from my iPad

Wednesday, April 20, 2011

We've been framed.

Our frame has gone up today. I didn't expect it to happen so quickly! So far the weather is holding off for us, lets hope it continues.

 Bathroom & Bedroom 3

 Hallway and Dining room

 Entrance Hall & Garage

 Home Theater & Kitchen

Alfresco and Master Suite 

 En-suite and WIR

 Bedroom 4 & Bedroom 4 Robe

 Toilet and Laundry

 External Front & Back

Leisure Room