Wednesday, August 17, 2011

Weekly Photo - Week 23

Weekly Progress photo 14/8/2011

Changes: handover/settlement, moving, temporary blinds installed, letter box.





I thought I would do a week 23 post as half the week it was still being finished off with final touches.

- Posted using BlogPress from my iPhone

Wednesday, August 10, 2011

It's ours!! YAY!

Today was handover day. Everything went well and the team at Wisdom have been brilliant. We are very thankful for the quality of work and professionalism from them. Now for the move. Ahhh!!!!


- Posted using BlogPress from my iPad

Tuesday, August 9, 2011

Downpipes and meter box painted

Our down pipes and meter box have been painted to match our water tank and gutters.

I have also arranged for all necessary utilities to be connected.




- Posted using BlogPress from my iPad

Weekly photo - Week 22

Weekly Progress photo 7/8/2011

Changes: gutters and meter box painted, rubbish removed from site, all points found during PCI fixed (as far as I can see)




- Posted using BlogPress from my iPhone

Almost time!!!

After speaking to the builder yesterday it appears everything is go for tomorrow.

This means tomorrow morning I shall get the keys, garage door controls and unrestricted access to the house. WOO HOO!!!!

Thanks to all who have followed our journey this far. :-)


- Posted using BlogPress from my iPad

Thursday, August 4, 2011

External Photos

Nothing much has happened build over the last week wise except for the finishing touches to the cosmetic things we found during the PCI, so I thought I would upload some external photos after the site fence has been removed.



Weekly Photo - Week 21

Weekly Progress photo 31/07/2011

Changes: PCI Done, Home Theater cabling, Handover booked, whirly bird installed, site fence removed

First time of parking the car on the driveway.

Thursday, July 28, 2011

Photos and tentative handover

Seeing that we got to go inside today I took the chance to grab a few pics.

Our handover has been booked for August 10th and our SS has confidence that this will happen, as long as all other parties play along.

Here are the pics:




Kitchen Splash back




Wet areas


Linen/Media Cupboard


Leisure Room Media alcove


Home theater cabling


Garage door motor

PCI Done!

We had our PCI today and boy didn't we go through the house with a fine tooth comb. We rattled things, opened and closed things and turned things on and off. We were expecting to find a few things but everything we found was mostly cosmetic. I think my site supervisor got sick of me saying " I don't remember the house being this big" lol.

Sunday, July 24, 2011

Weekly Photo - Week 20

Weekly Progress Photo 24/07/2011

Changes: Internal living area tiles, carpet, driveway, tiling complete, some cleaning, home theater cabling done, PCI arranged.

Carpet and Practical Completion inspection.

Dropped by today to find that our carpet has been laid in all rooms and some cleaning has been done.

We also received a call from our Site supervisor to book in our PCI for 28/7 at 0900hrs.

Things have really moved along and it seems like a good time for us to start packing.






Internal Floor Tiles

Internal floor main living area tiles have been laid. shouldn't be long before carpet, cleaning and MOVING IN!!! Can't wait!
Still unable to get in to take photos so through the windows will have to do. We just seem to show up at the wrong time when nobody is there.




Driveway Done

Things are steaming ahead at the moment. Our driveway has been laid. It brings together all of our colours and we are very very happy with them all.

Weekly Photo - Week 19

Weekly Progress Photo 17/07/2011

Changes: Tiling almost complete, home theater Cabling started, electrical completed, more fittings installed, door furniture installed, kitchen splashback done, down pipes installed

Friday, July 15, 2011

One Big update!!

Due to a few things happening at the moment, here is one big update to cover quite a few things that have happened over the last week or so.

Water Tank and down pipes installed


 

Door Furniture installed.




Wet Area fittings installed







 Electrical and Kitchen Splash Back done.